DEPO2015 buildings are undergoing renovation > Operation is limited, but we are not closing!
A total "major" reconstruction, during which the entire DEPO was to be closed for several years, is not planned, the reconstruction is taking place gradually, with partial operation. Based on the experience from the first phase of the reconstruction, we can promise the implementation of most of our activities in 2026, although in a limited operating mode.
The investor and contracting authority of the construction is the city of Pilsen. The company Plzeň 2015, z. ú. , which is the operator of the creative and cultural zone DEPO2015 , has only an advisory role in the planning and implementation of the construction.
In the first and second phases of the reconstruction in 2024–2025, the roof and windows of the SO 02 building, which houses the Ústředna café, the Plumber's Shop, the Market and all adjacent spaces towards Cukrovarská Street, are being replaced. The construction is being handled from the Cukrovarská Street side, and the second building, the Bus Hall and all other spaces towards Presslova Street, including rental spaces, the new Foyer café, the parking lot and the courtyard, can be used at all times . The reconstruction of the roof covering will be completed by 29 September 2025.
The third phase is planned for November 2025 - June 2026 , and will reconstruct part of the interiors in the same building marked SO 02. The bus hall and all other spaces towards Presslova Street, including rental spaces, the new Foyer café, parking and courtyard, will continue to be accessible. We expect the third phase to be completed by June 30, 2026.
All long-term rental spaces in Hall SO 02 will be unavailable until the end of June 2026. We will be looking for new tenants during spring 2026.
It is currently possible to reserve a date for your events at DEPO2015 in the years 2025–2027 , however, we would like to inform interested parties of a possible change in the situation according to current developments.
The schedule for the subsequent reconstruction in 2026–2027 is currently being prepared in connection with the construction development of the surrounding area. The DEPO2015 building is to continue to serve culture and the development of creative industries in the future. New development is planned for the entire area, which will significantly transform this district in the future, see the Cukrovarská territorial study and the Doudlevecká territorial study.
Thank you for your understanding and support,
DEPO2015 team



STAGE 1: 1/10/2024 – 31/5/2025
STAGE 2: 1 June – 29 September 2025
STAGE 3: December 2025 – June 30, 2026